Cassidy & Associates
Cassidy Base Schedule
Health
red
Move-In
2026-05-21
Order Release
2025-12-12
Variance
-125 days
Project Ownership
Executive Summary
Live AIForecast shows an accelerated move-in date compared to baseline. The project is currently marked red based on schedule health, compression, and milestone risk.
Recommendation: Validate order release feasibility before committing to the current forecast.
Critical Dependency
Order Release Required By
2025-12-12
To hit move-in on 2026-05-21, this release date must be protected.
Health
red
Baseline Move-In
2026-09-23
Locked reference
Forecast Move-In
2026-05-21
Current calculated plan
Generating summary...
design_days is below minimum (1 < 3)
Blackout dates are contributing 3 days to the schedule.
Phase Flow
Project phasing map
High-level view of how this project flows from proposal through planning, procurement, production, installation, and move-in.
Proposal / RFP
RFP issued, response, review, award.
Key Date: 2026-04-08
Planning & Design
Programming, design development, client approval.
Key Date: 2026-04-08
Procurement
Proposal, approvals, RTO, order entry.
Key Date: 2025-12-12
Production
Manufacturer lead time, shipment, receiving.
Key Date: 2025-12-12
Workstation
Steelcase • 40 days
Private Offices
Kimball • 60 days
Installation
Delivery, install, punch, closeout.
Key Date: 2026-05-21
floor 1
first floor • Install 40 days • Punch 2 days
Construction
External phase. Track start/end only for now.
Mock-Up
Optional branch for mock-up review and approval.
Workspace
Where do you want to go?
Build and compare execution strategies.
Review baseline, forecast, actual dates, and slip movement.
Manage milestone dates, ownership, and status.
Manage holidays, non-working dates, and constraints.
View changes, history, and snapshots.
Capture, compare, and restore baseline versions.